I'm using Desktask 1 RC 4 and Outlook 2003 on an exchange server.
When I set the tasks page with "Show Completed" unselected, but add more than one category in the category list, it shows completed tasks also. Works OK with one category.
If I use the "Don't show selected category" check, then I can't have more than one category listed. If I have 1 listed, it works. If I have two, then I get all the categories listed, and completed tasks also (regardless of the "show completed" status)
Otherwise, a terrific tool. |